Change Orders on Commercial Jobs: 4 Questions That Decide Whether the Change Is Worth It

The code, the schedule, the paperwork and the risk. Four questions that turn a change order into a decision instead of an argument.

Commercial job site with rolled construction drawings on a table beside the work
Illustration — the drawings on the table and the work behind them, which is where a change order is either decided or deferred.

A change order is a request to do something the drawings do not say, and on a commercial job it is never only about the money. It is about the inspection that has already happened, the inspection that is coming, the schedule everybody signed and the paper trail that has to survive both. Four questions, and the answers decide whether the change is worth doing now or worth doing later.

1Does the change touch anything that was already inspected

This is the first question and it is about the sequence. If the electrical inspector has already signed the panel and the change adds a circuit, the inspector has to come back, and the panel may have to be opened and re-energized around people working in the space. The same is true of the fire alarm, the sprinkler, the egress and the accessibility of the space: a change that lands after an inspection does not just cost the work, it costs the inspection again. The changes that land cleanly are the ones decided before the trade is in the space.

2Does the change keep the building compliant

A change can turn a compliant space into a non-compliant one without anybody noticing. Moving a partition can close the clear width of an exit route or put a door where a route has to be, adding a wall can change the acoustics and the fire separation, and moving a receptacle or a piece of equipment can put it where the wiring rules do not allow it. The requirements that matter here are specific: the exit routes have to stay free and unobstructed and each exit has to be clearly visible and marked, and the electrical work has to use approved and listed equipment installed per its listing, with a completed installation free from recognized hazards.

3Does the change move the critical path

On a commercial job the question is not whether the change takes two days or two weeks, it is whether it lands on the path that decides the opening date. A change to the electrical room or to the kitchen hood lands on the critical path; a change to the paint in a corridor does not. Ask for the schedule with the dependencies written down, and ask where the change lands on it. If the change touches the item that has no float, the schedule moves by the length of the change plus the length of the reinspection, and that second number is the one people forget.

4Is the risk of doing it now smaller than the risk of doing it later

Sometimes the right answer to a change is no, not because it is a bad idea but because the building is not ready for it. A material that changes the way the space is used, a piece of equipment that needs a different foundation or a different clearance, a scope that changes what the fire alarm has to do: those are cheaper to change on paper than in the field. The EPA rule for the renovation and demolition of asbestos-containing material is the clearest example of the same idea in the regulations: the notification has to happen before the work does, not after.

How to process a change

Two things, and both of them are about the paper.

Get the change in writing, with the drawings

Ask for the change to be described the way it will be built, not the way it was asked for: which drawing, which detail, which revision. A change order that says move the door to this location, with the mark-up attached, is a document. A change order that says adjust per the request is not, and three months later nobody agrees on what was adjusted.

Ask what it changes in the inspection plan

Ask which inspections are affected, which have to be repeated and who books them. On a job with a fire alarm, an emergency action plan and a building department review, the change order is really a revised inspection sequence, and the owner should be told what it does to the sequence in the same conversation where the price is discussed.

What to ask before you sign

Two questions, and both of them are about the record.

Who carries the cost and who carries the delay

Ask how the cost of the change is handled, what the schedule effect is, and what happens to the completion date if the change creates an inspection delay. It is not about winning the argument about the money, it is about the fact that a change with a price but no schedule effect is a different thing from a change with both.

Does the change affect the handover documents

Ask what has to be updated: the emergency action plan, the training for the staff, the safety data sheets for the new materials, the accessibility of the space as it will be handed over. The hazard communication standard requires the written program with the chemical lists, the container labeling, the safety data sheets and the training, and a change that introduces a new material on a Friday is a change that shows up on the first inspection.

The four questions

The questionWhat it decidesThe document that answers it
What has already been inspectedWhether the change lands before or after the sign-offThe inspection log and the sequence
Does it keep the space compliantThe electrical, the egress, the alarm, the accessThe codes and the approved shop drawings
Does it move the critical pathThe date, not just the durationThe schedule with the dependencies
Now or laterWhether the cost of the change is the smaller costThe mark-up, the notification, the sequence

Where this comes from

Six public documents: the electrical rules, the exit routes, the emergency action plan, the asbestos notification, the accessibility standards and the hazard communication program.

Start with the change order itself. Everything else on this list exists to answer one of the four questions, and the document is what the questions get asked against.

We run the same change control on every commercial build-out we do. See our process →

Want the changes on your job decided instead of absorbed?

We price them, schedule them and check what they do to the inspections, before anybody signs.