Blog · Kitchen Remodel
Kitchen Remodel: What Happens Between Demolition and the First Meal (Day 1 to Day 30)
The week where the cabinets come out, the wall comes open and the schedule decides everything. What a kitchen does between the demolition and the first meal.
The part of a kitchen remodel nobody photographs is the part between the demolition and the first meal, and it is the part that decides whether the project ends on time. It is not empty space, it is a sequence with rules in it: what has to be checked before the wall comes open, what has to be closed before the cabinets go in, and what has to be signed off before anybody cooks anything.
1Day 1: the demolition, and what it is allowed to disturb
Taking a kitchen apart looks like the messy part and is actually the regulated part, and two federal rules switch on the moment the work starts. The asbestos standard classifies the work by type and requires the competent person to identify the asbestos hazards and choose the control strategy before the work happens, and the EPA rule for the renovation and demolition of asbestos-containing material sets the notification and the work practices. The silica standard sets the limit for the dust from cutting tile and concrete. The lead rules apply to the paint on a house built before 1978. A crew that treats the demolition as ordinary cleanup ends up with a stop-work order on day 1.
2The rough-in: the wall, the floor and the services
Once the cabinets are off and the wall is open, the house tells you what it is made of: plaster or drywall, a joist where a joist should not be, a plumbing line that goes nowhere, an electrical run added by somebody in a hurry. This is where the electrical work happens, and the rules are not negotiable: the conductors and the equipment have to be approved, listed equipment installed and used according to the instructions in its listing, and the completed installation free from recognized hazards. The new circuit for the island, the range circuit and the lighting get decided here, and a decision made here is cheap and one made later is not.
3The close-up: the surfaces that hide the work
Drywall, tile, paint, the floor: everything that goes on after the rough-in is also everything that hides it. The kitchen that looked like a structure now has to become a room, and the sequence is not negotiable either: the waterproofing and the backer board go on before the tile, the tile goes on before the cabinets, and the cabinets go on before the counter. The gap in the schedule is usually the one nobody wrote down, the cure time and the drying time between two layers that have to be right the first time.
4The install: cabinets, counter, appliances and the sink
This is the part that looks like the finish and is actually the longest lead item. The cabinets are made to order, the counter is measured after the cabinets are installed, and the appliances have to be on site and unboxed before they are connected. The sink and the faucet are connected after the counter, the dishwasher and the disposal after that. Nothing in this phase is a surprise if the measurements were taken at the right moment, and everything in it is a surprise if they were not.
5Day 30: the punch list and the first meal
The last week is the punch list, which is the list of everything that is not quite right: the door that does not close, the drawer that catches, the caulk line that needs another pass, the outlet that is in the wrong place, the switch plate that sits proud. It gets written down, it gets fixed, and it gets signed. And then the kitchen is cleaned, the ventilation is run, the windows are opened, and somebody cooks. Thirty days from the day the cabinets came out to the day the first meal happens in the new kitchen, and the schedule that got them there was written on day 1, not on day 30.
What to ask the contractor before day 1
Two things, and both of them are about the sequence.
Who is checking the house before it is opened
Ask who surveys the house for asbestos and for lead paint before the demolition, and ask to see the report. On a house built before 1978 the lead-based paint provisions and the renovation work practice standards are a legal requirement, not a courtesy, and the survey is the document that proves the crew did it properly.
What is on the critical path
Ask for the schedule with the dependencies written down, and ask which item is the one that moves the end date when it slips. In almost every kitchen it is the cabinets, and the second one is the counter, because the counter is measured after the cabinets are in. Those two lead items decide the last three weeks of the project.
What to ask on day 30
Two things, and both of them are about the handover.
What is on the punch list and who signs it
Ask for the punch list in writing, before the payment, and ask what is not on it because it was never in the scope. A punch list is the document that closes the project, and the last ten percent is usually held against it.
What has to happen in the room before the first meal
Ask about the cleaning, the ventilation and the air. A renovation leaves dust in the returns and in the ducts, and the EPA is blunt about why that matters: the key to mold control is moisture control, and wet or damp materials have to be dried within 24 to 48 hours of a leak or a spill because in most cases mold will not grow in materials dried that quickly.
The sequence
| The phase | What happens | What it waits on |
|---|---|---|
| The demolition | The cabinets come out and the wall opens | The survey and the notification |
| The rough-in | The electrical, the plumbing, the wall | What the demolition uncovered |
| The close-up | The waterproofing, the tile, the paint | The rough-in inspection |
| The install | The cabinets, the counter, the appliances | The cabinets and the counter lead time |
| The handover | The punch list, the cleaning, the first meal | Everything on the list signed |
Where this comes from
Five public documents, and they cover the demolition, the dust, the old paint and the wiring.
- eCFR — 29 CFR 1926.1101, Asbestos — the classification of the work by type, the competent person who identifies the asbestos hazards and selects the control strategy, and the training and the waste disposal requirements.
- eCFR — 40 CFR 61.145, Standard for demolition and renovation — the notification requirement for a renovation or demolition that disturbs asbestos-containing material, and the work practices that go with it.
- eCFR — 29 CFR 1910.1053, Respirable crystalline silica — the permissible exposure limit for respirable crystalline silica and the definition of the regulated area where that limit can be exceeded.
- eCFR — 40 CFR 745.65, Lead-based paint poisoning prevention — the certification, the occupant protection and the clearance requirements, and the renovation work practice standards, alongside the HUD rules at 24 CFR part 35.
- eCFR — 29 CFR 1910.303, Electrical, general — that the conductors and the equipment have to be approved, that listed equipment is used per its listing, and that a completed installation is free from recognized hazards.
Start with the asbestos standard and the demolition rule. They are the two documents that decide what day 1 is allowed to look like.
The same sequence runs on every kitchen we build. See our process →
Want the days between the demolition and the dinner to behave?
We write the sequence down, with the dependencies, the lead items and the inspections in the right places.