Kitchen Remodel Cost: 7 Numbers That Decide What You Actually Pay (and the One Most Contractors Skip)
No prices in this article. Seven quantities that drive the bill, and the one that decides whether the bill changes halfway through.
This article has no prices, and that is on purpose. A price belongs to your address, your date and the crew that shows up, and it goes out of date the day it is printed. What does not go out of date are the quantities underneath: seven numbers everybody can count and verify, and one more that decides whether the number on the estimate is the number you pay.
1The number of electrical circuits the kitchen needs
A kitchen has more appliances than any other room and they are all on the same counter. The circuits are decided in the first week and are the first thing that changes when the layout changes: the range, the microwave, the dishwasher, the disposal, the island, the pantry, the lighting. The rules are not negotiable: the conductors and the equipment have to be approved and listed equipment installed per its listing, with a completed installation free from recognized hazards. Count the circuits and you have counted the electrician hours.
2The number of plumbing fixtures that move
A sink moves, a dishwasher moves, a disposal moves, the ice maker and the filter move. Every fixture that moves is a rough-in, and every rough-in is hours nobody can compress. A fixture that moves into a new wall means a new wall, and a new wall means the tile, the paint and the electrical that go with it.
3The number of square feet of floor that get a new surface
The floor is the easiest number on the list to get right, because it is the one everybody can see. It also hides what makes the difference: whether the old floor comes up, what is under it, whether the subfloor has to be replaced and whether the new floor is the same material as the old one. A floor that looks like a square number on the plan can be a demolition day or a glue-down afternoon, and the difference is in what is underneath.
4The number of square feet of wall that get a new surface
The walls are where a kitchen quietly becomes expensive, because the surface area multiplies: the backsplash, the wall behind the new cabinets, the walls that come down and get patched, the wall that gets a window. It is also where the wet work lives. The surface behind the tile has to be prepared, and the one behind the cabinets is the surface nobody will see and nobody should forget to count.
5The number of cabinet boxes
This drives the largest line item in most kitchens and it is not the same as the number of cabinets. A tall pantry that runs to the ceiling is three boxes and a filler, a base cabinet with a drawer bank is four boxes, and the box count is what the factory quotes from. It also has the longest lead time, because the cabinets are made to order and the counter is measured after they are installed, so the two decide the last three weeks of the project.
6The linear feet of counter
Counter is measured in linear feet, not square feet, and it is the number that surprises people, because a kitchen with a big island has a lot of counter and a galley wall has a lot of edge. It also brings two decisions: how the counter meets the wall and how it meets the appliances. A counter with a full backsplash and one with an upstand are not the same fabrication, and the edge detail and the sink cutout are decided here, not at the install.
7The number of appliances that get replaced
Each appliance that gets replaced is a delivery, a connection and a haul-away, and each one that does not is a question about whether it still works and whether it still fits. The refrigerator is the one that catches people: it decides the door swing, the cabinet depth and the floor space in front of it, and its dimensions are the ones least often checked against the drawing before the cabinet order goes in.
The one most contractors skip
It is not a quantity of material, it is a quantity of decisions.
The number of decisions you have not made yet
Every open decision in a kitchen is a change order later, and a change order always costs more than the same decision made in advance. The appliance that is still undecided, the tile that has not been chosen, the light fixture, the wall finish, the counter edge, the range that does not fit the opening. Write them down with a date: the ones not decided by the time the cabinets are ordered are the ones that change the price on site.
The number of things the demolition might find
The number of surprises is not knowable before the wall comes open, which is exactly why the survey before the demolition is not optional. A wall that comes down can reveal an asbestos-containing material, and the renovation rule sets the notification requirement and the work practices; a house built before 1978 can have lead-based paint, with its own work practice standards; and cutting concrete and tile puts respirable crystalline silica in the air, with its own exposure limit.
How to use the seven numbers
Two things, and both of them are about the comparison.
Compare two estimates on the same seven
Two estimates for the same kitchen can differ a lot and still be close, and the difference is usually one of these seven numbers counted differently. Ask both sides for the same seven, in the same order, and the comparison becomes a conversation about quantities instead of totals.
Ask what is explicitly not in the number
Ask what is excluded: the demolition and the disposal, the floor and the subfloor, the electrical service, the permits and the inspections, the appliance delivery, the final cleaning. Every estimate has a line for what is not included, and that line is where the change orders come from.
The seven numbers
| The number | What it drives | Who can verify it |
|---|---|---|
| The electrical circuits | The electrical hours and the panel | The electrician and the panel |
| The plumbing fixtures that move | The rough-in hours | The drawing and the plumber |
| The square feet of floor | The demolition and the subfloor | Anyone with a tape |
| The square feet of wall | The wet work and the patching | The drawing |
| The number of cabinet boxes | The fabrication and the lead time | The cabinet drawing |
| The linear feet of counter | The fabrication and the edge | The template at install |
| The appliances replaced | The delivery and the connection | The model numbers |
Where this comes from
Five public documents, and the rules behind the quantities.
- eCFR — 29 CFR 1910.303, Electrical, general — that the conductors and the equipment have to be approved, that listed equipment is used per its listing, and that a completed installation is free from recognized hazards.
- eCFR — 40 CFR 61.145, Standard for demolition and renovation — the notification requirement for a renovation or demolition that disturbs asbestos-containing material, which is what the wall that comes down can reveal.
- eCFR — 40 CFR 745.65, Lead-based paint poisoning prevention — the certification, occupant protection and clearance requirements, and the renovation work practice standards for a house built before 1978.
- eCFR — 29 CFR 1910.1053, Respirable crystalline silica — the permissible exposure limit for respirable crystalline silica and the definition of the regulated area where that limit can be exceeded.
- EPA — Improving Indoor Air Quality — the order of priorities, source control before ventilation, and the outdoor air rate the mechanical ventilation has to deliver for the use of the room.
Start with the asbestos rule. It decides what the demolition day looks like, and that day is where the price starts to move.
The same estimating discipline runs on every kitchen we build. See our process →
Want the estimate written in quantities instead of adjectives?
We count the same seven numbers before we price anything, so the conversation stays on what can be checked.