(901) 334-1320

Blog · Office Build-Out

Furnishing an Office to Open: 6 Items That Cannot Wait Until the Last Week

The power at the desks, the route to the exit, the turn in the hallway, the alarm, the air and the wayfinding. Six things that have to be decided early.

Office being furnished with desks, task chairs and a box of cables
Illustration — an office being furnished, which is the moment the layout either works or has to start over.

Furnishing an office looks like the easiest part of the fit-out and is the part that cannot be rushed. The furniture is cheap to change in the first month and impossible to change in the third, and six of the decisions have to be made before the first desk lands, because each one is about a room that a wall or a ceiling will not give back.

1The power and the data at each desk

Desks need power, and power means a circuit, and a circuit means a panel with space in it. The electrical rules are not negotiable: the conductors and the equipment have to be approved, listed equipment has to be installed and used according to the instructions in its listing, and a completed installation has to be free from recognized hazards. A floor box or a power module specified after the carpet is down means the carpet comes up. This is the item with the longest lead time on the list, because the circuit has to be designed, permitted and installed before the furniture can be ordered.

2The route to the exit

Furniture is the first thing that gets put in the way of a door, because a desk is easier to move than a wall. The requirement is specific and it is checked on the day: the exit routes have to be free and unobstructed, with nothing placed in them, and each exit has to be clearly visible and marked, with no decoration or sign allowed to obscure the exit door. A layout that reads well on the plan and puts a storage unit in the path of the exit has to be redone, and doing it after the tenant moves in means doing it in occupied space.

3The turn in the hallway

This is the one nobody thinks about until somebody in a wheelchair tries to get through it. The accessibility standards set the minimums: the clear width of walking surfaces, the turning space, and the maneuvering clearance where a route has to turn. Furniture narrows the space that the walls left, and a desk that projects into a corridor takes the clearance away from the people who need it most. The rule of thumb: the furniture layout is a design document, not a purchasing decision, and the clear widths get marked on it the way they get marked on the architectural drawing.

4The alarm and the emergency lighting

The emergency action plan is a document the employer has to have, and it comes with an employee alarm system that uses a distinctive signal for each purpose. Furnishing changes that system: a moved partition changes where the sound goes, and a raised ceiling changes where the strobes go. The alarm has to be heard in the space as it is furnished, not in the space as it was drawn, which means the test happens with the furniture in it, and the notification devices and the emergency lighting get placed against the final layout.

5The air, and where the diffusers end up

Furniture fights the HVAC, and the HVAC was designed for an empty room. A diffuser centered on an empty floor ends up blowing at the back of a cabinet, and a return on the wall ends up behind a credenza. The EPA is clear on the order of priorities: source control first, and the mechanical ventilation that brings the outdoor air in has to be designed around the use of the room. The treatment is to put the diffusers and the returns on the furniture layout, not to put the furniture wherever the diffusers happen to be.

6The things that fix the plan and cannot be bought late

The floor protection, the wayfinding, the reception position, the phone and data cabling, the storage: these are the items with a long lead time or a dependency, and they are the ones that push the opening date when they arrive late. The floor protection has to be decided before the flooring goes in. The cabling has to be in the walls before the ceiling closes. The wayfinding has to be ordered with the signage of the building, not after. Each one is cheap in money and expensive in schedule, and all six are decided in the same week as the layout.

How to sequence the furnishing

Two things, and both of them are about the drawing.

Put the furniture on the plan before it is ordered

Ask for a furniture layout with the clear widths marked, the diffusers and returns shown, the exit routes and the alarm devices in place. Every one of the six items above is visible on that one drawing, and that is where a mistake costs nothing.

Ask for the lead times in writing, with the dependencies

Ask which items have a lead time and which ones depend on another or on a trade finishing. A furniture order that arrives before the floor protection, or a phone system that needs cabling that has not been pulled yet, is a schedule problem that shows up in the last week of a job that is otherwise finished.

What to ask before the handover

Two questions, and both of them are about the day the doors open.

Has the alarm been tested with the room furnished

Ask to hear the alarm in the finished space, with the layout as it will be. It is the cheapest test in the building and it catches the partition that killed the sound in a corner.

Can somebody in a wheelchair get to every desk

Ask for the route to be walked, from the entrance to the far desk, in the furnished room, and ask the clear width to be measured with the chairs pulled out. A chair pulled out for a meeting takes more space than a chair pushed in, and the layout has to work with the chairs in use.

The six items

The itemWhat it depends onWhen it has to be decided
The power and the dataThe panel space and the circuit designBefore the flooring and the carpet
The route to the exitThe final layout of the doorsBefore anything is ordered
The turn in the hallwayThe clear widths on the planBefore anything is ordered
The alarm and the lightingThe final position of the partitionsBefore the ceiling closes
The air and the diffusersThe use of the room and the layoutBefore the furniture is ordered
The floor, the signage and the cablingThe trades and the lead timesBefore the purchase orders

Where this comes from

Six public documents, and every one of them is about a rule that the furniture has to respect.

Start with the exit route standard. It is the shortest one and it is the requirement that the furniture layout fails most often.

The same layout discipline runs on every office build-out we do. See our process →

Want the office to open without a last-week scramble?

We put the furniture, the power, the air and the routes on the same drawing, and we decide them before the orders go in.