Reading a Commercial Floor Plan: 4 Things That Are Not Actually There

The walls, the exits, the utilities and the equipment. Four things every commercial drawing shows and no commercial drawing guarantees.

Architectural floor plan drawings spread on a table with a metal ruler
Illustration — a set of commercial drawings, which is where the four things that are not there get decided.

A commercial floor plan is a promise about a space, and it is the most optimistic document in the industry: it shows everything that will exist and nothing about what it costs, what it has to connect to, or what somebody has to be able to do next to it. Four things are always drawn and never guaranteed. Learning to see them on the plan is the difference between a fit-out that works and a fit-out that gets redrawn.

1The walls, and which ones belong to whom

The plan shows walls in two different ways: the ones that already exist and the ones that are proposed, and the difference is in the line weight and always in the note block. The one that catches people is the demising wall, the separation between the space and the rest of the building. It is drawn as a line, it has to meet the building structure, it has to have the fire separation it is required to have, and nobody draws the thickness it needs, because the drawing is a diagram of an idea and the wall is a decision. Ask which walls exist, which are new, which are the landlord’s and which are yours.

2The exits, and the path to them

The plan shows an exit and a path to it, and both are claims. The requirement is specific: the exit routes have to be free and unobstructed, with nothing placed in them, the exit access must not go through a room that can be locked, and each exit has to be clearly visible and marked, with no decoration or sign allowed to obscure the exit door. A plan that routes the path of egress through a room that will be locked at night, or through the storage somebody is going to want later, has a problem that shows up at the inspection, and the fix is a door and a sign.

3The utilities, which are drawn for reference and not for construction

The HVAC, the electrical, the plumbing and the sprinkler are drawn to show the space they occupy and roughly where they run, and the drawing that carries them is usually a reference drawing. What is not on it: the electrical service and the panel locations, the equipment that needs its own clearance, the risers, the horizontal runs that have to go above the ceiling and what they need to get there, and the routes for anything that has to come from the street. The equipment that comes in on a truck has to get to the room, and the plan does not show the door it comes through.

4The equipment, and the space around it that nobody drew

A plan shows a rectangle where the equipment goes. It does not show the working space around it, and for the electrical that space is a requirement with a dimension: the depth of the working space has to be clear and the equipment has to be installed and used according to its listing, with a completed installation free from recognized hazards. It does not show the access panel in the ceiling, the clearance for the filter, the room for somebody to change a belt, or the fact that the equipment in the drawing is going to be a different size when it is ordered.

How to read a plan before you sign

Two things, and both of them are about the questions at the bottom of the sheet.

Read the notes, the code block and the revision column

The notes are where the drawing states what it is and what it is not, and they are the part of the sheet that changes the meaning of everything above it. The code block lists the code basis, the occupancy and the construction type, and those three decide what the exits and the separations have to be. The revision column tells you how old the drawing is, and a floor plan with three revisions and no dates is a document that has been argued about in a meeting.

Ask for the drawing set, not the floor plan

A floor plan is one sheet. Ask for the electrical, the mechanical, the plumbing and the reflected ceiling, and ask for the code analysis. Then ask for the as-built drawings of the building, because the space you are leasing was somebody else’s space once and the column positions in the corridor outside your door are not where the plan says they are.

What to ask before the estimate

Two questions, and both of them are about the four things.

What is assumed and what is excluded

Ask which of the four items above the estimate is assuming: the demising wall, the exit route, the utility connections and the equipment clearance. Every one of them is a place where the drawing and the building can disagree, and every one of them is a line in the estimate that nobody wants to discover later.

Which drawing will be submitted for review

Ask which sheet goes to the building department and which goes to the fire marshal, and ask for the food establishment plans when the space has a kitchen, because those have to carry the intended menu, the anticipated volume of food, the proposed layout, the mechanical schematics, the construction materials and the finish schedules. A layout that changes after that review is a layout that goes back.

The four things

What the plan showsWhat is not thereThe question to ask
The wallsWhich ones exist and who builds the demising wallWhich walls are new and which are the landlord’s
The exits and the pathThe locked room on the route and the storage on itIs the path of egress clear and unlocked
The utilitiesThe panel, the risers and the real routingWhere the service enters and what is in the core
The equipmentThe working space and the service accessHow big is it when it is ordered and where it is serviced

Where this comes from

Five public documents: the exits, the alarm, the electrical working space, the accessible route and the plans a food establishment has to submit.

Start with the exit routes. A floor plan that cannot survive 1910.37 is not a fit-out plan, it is a picture of one.

We read the same drawings the same way on every commercial build-out. See our process →

Want the drawing and the building to agree before you sign?

We mark the four gaps in the set before the estimate, so they end up in the scope and not in the change order.