Blog · Roofing
Roof Flashing: 4 Places Water Enters a Roof That Have Nothing to Do with Shingles
The wall, the chimney, the skylight and the pipes. The four places a roof leaks, and why none of them are the field of shingles.
When a roof leaks, the stain appears somewhere else: on a ceiling, in a corner of a bedroom, down a wall that has nothing to do with the roof. And the first instinct is to blame the shingles, because the shingles are the part of the roof anybody can see from the ground. The truth is that the field of shingles is rarely where the water gets in. Here are 4 places where it does, and none of them are the shingles.
1Where the roof meets the wall
The roof-to-wall intersection is the most common place a roof fails and the least visible from the street, because the shingles stop at the wall and the joint is covered by metal. FEMA has a technical fact sheet on exactly this detail, on typical and enhanced flashing techniques, and the principle behind it is simple: the flashing has to shed the water that runs down the wall over the shingle courses, and it has to do it with laps that go the right way and sealant that is not the primary defense. The FEMA guidance on window and door installation says the same thing about openings, that the detail should not depend solely on sealants.
2The chimney
A chimney is a hole in the roof with a hole in it, and it is where the counter-flashing and the step flashing meet. This is the second most common leak on a shingle roof, and the reason is that the two systems have to work together: the counter-flashing is supposed to be the piece that sheds the water down over the step flashing and the sealant, and when the counter-flashing is wrong or the step flashing is too short, the water goes behind the chimney instead of over it. FEMA notes that high winds can damage roof flashing and put the home at greater risk of water intrusion, with the mold that follows.
3The skylight
A skylight is a window in the roof, and the roof around it has to be built like the wall around a window: a curb, a pan and a flashing that runs up the curb and out over the shingles. The metal is not the hard part, the hard part is that the curb has to be tall enough, the pan has to be flashed into the roof deck and the sealant has to be on the surfaces that are meant to be sealed, not on the ones that are meant to shed. FEMA lists the skylight explicitly among the projections from the roof where the flashing is what keeps the moisture out.
4The pipes and the vents
Every vent pipe, every flue, every bathroom exhaust and every little penetration through the deck is a hole, and each one gets a boot or a flashing collar that has to be integrated with the shingles rather than set on top of them. This is the one that quietly gets worse over time, because the boots are the part of the roof that the sun hits every day and the part nobody looks at. FEMA is direct about the routine: cracking, debris or gaps between flashing and the wall or roof surfaces allow moisture to enter the home and should be checked routinely.
How to look at the flashing
Two things, and both of them are free.
Look at the ceiling first
FEMA tells you to start inside: check the attic and the ceiling for staining or discoloration, because if it is there, the water is already getting in and the flashing is where to look next. A stain that appears in a winter storm and dries out in the summer is a flashing problem almost every time, and it is a problem that the shingles will never explain.
Look at the projections, not the field
If the roof can be accessed safely, check every safely accessible projection, the chimney and the skylight, for gaps or damage to the flashing or the sealant. And if the roof cannot be accessed safely, that is the answer too: nobody goes on a walking-working surface with an unprotected side or edge without fall protection, and the criteria standard sets out what that protection has to be.
What to ask a roofer
Two questions, and both of them are about the details.
What is the flashing detail at each projection
Ask for the detail at the roof-to-wall, at the chimney, at the skylight and at the penetrations, and ask what the flashing is made of. FEMA recommends using flashing that meets or exceeds the local building code requirements in high-wind areas, and the local planning or building department is where the requirements are written down.
Is the underlayment the second line of defence
Ask whether the underlayment is there and how it is integrated at the details, because FEMA treats the underlayment on an asphalt shingle roof as an enhanced secondary water barrier against wind-driven rain, not as a substitute for the flashing. If the flashing is going to be done properly, the underlayment is what saves the house on the night the flashing is tested.
The four places
| The place | What the detail is | What you look for |
|---|---|---|
| The roof-to-wall joint | Step flashing under the shingle courses | Laps that go the right way, sealant as backup |
| The chimney | Step flashing under a counter-flashing cap | The counter-flashing that sheds over the steps |
| The skylight | A curb, a pan and a flashing up the curb | The pan flashed into the deck, the laps shingled over |
| The pipes and vents | A boot or a collar integrated with the shingles | Cracking, debris and the gaps around it |
Where this comes from
Four public documents, and the first one is the definition of the whole problem.
- FEMA — Check Your Roof Flashing — that flashing is a thin layer of waterproof material, typically metal or vinyl, to prevent moisture from entering the interior, that it sits at the windows, the doors and the projections from the roof such as a chimney or a skylight, and that cracking, debris or gaps let the moisture in.
- FEMA P-499 — Home Builder’s Guide to Coastal Construction — the technical fact sheets: roof-to-wall and deck-to-wall flashing with typical and enhanced techniques, the roof sheathing, the underlayment for asphalt shingle roofs and the shingles in high-wind regions.
- EPA — A Brief Guide to Mold, Moisture and Your Home — that moisture control is the key to mold control, the 24 to 48 hour window, and the hidden mold that starts in and around the walls and the roof materials above the ceiling.
- eCFR — 29 CFR 1926.501, Duty to have fall protection — that the employer has to provide protection for employees on a walking-working surface with an unprotected side or edge, which is what decides whether the roof is inspected from the ground or from the roof.
- eCFR — 29 CFR 1926.502, Fall protection systems criteria and practices — what the fall protection has to be, from the guardrail to the personal fall arrest system.
Start with the FEMA flashing page. It is short, it is free and it tells you where to look before anybody climbs a ladder.
The same inspection runs on every roofing job we do. See our process →
Want the leak to be found where it actually starts?
We inspect the flashing at every projection, not just the field, and we show you what we find.